Plant 2 – Moulding Line Upgradation
- New 200 sets of moulding boxes.
- PLC upgraded to Siemens’ S7 from S5.
- All Drives & Controls and Valves replaced with state of the art electronics.
- Cycle time improvement from 36 secs to 32 secs.
- Moulding Machine upgraded.
- Control system of Sand Plant upgraded.
- Study & increased the Liquid metal availability.